17.5.09
6.4.09
Studioworks: Core Studio 2: Assign. 2
Studio project number 2 for this semester. This is basically a smart growth project where I used bicycle paths and pedestrianization as an organizing principle.
1.3.09
Studioworks: Core Studio 2: Assign. 1
I almost forgot to post this one. This is the first project for Core Studio 2. We were given a square in Cambridge and told to make a collage of a temporary use for the square. My partner and I came up with this idea of burying a Mammoth in the snow and then letting it slowly be uncovered as the snow melted.
22.12.08
Studiowork: Final Project
We finished up the final review of our first semester last week. The project itself should look familiar from the last set of boards I posted. Essentially we took our work from the last project, added implementation stuff and reworked the things that weren't working well in the last presentation.
23.11.08
Studiowork: Project 3
This is the main project that we've been working on in studio this semester. We present these on Monday, and then add two more boards on implementation after the thanksgiving break.
17.10.08
A few samples of work from our second assignment, which we just finished up:
And, as is featured here in my friend Siqi's iPod photo, due to a last minute room mixup, we ended up presenting in Piper Auditorium, which is the main hall at the GSD. Fancy Harvard lectern and all.
My Flickr site has the rest of the presentation and Siqi's has more photos from the presentation as well as his team's boards (he's an amazing graphic designer). Read more...